Creator:
Grębowski, Karol ; Zielińska, Monika
Contributor:
Title:
Group publication title:
Subject and Keywords:
dynamic analysis ; modal analysis ; historic bridges ; high-speed trains
Abstract:
The article presents the dynamic analysis of the historic railway bridge in Tczew as an example of the usefulness of such type of bridge for high-speed trains. The model of the bridge and the simulation of rolling stock passage was performed in SOFISTIK program. The scope of work includes experimental studies, the solution of the problem concerning the correct solution features of the dynamic model which takes into account the dependencies between the bridge, track and rolling - stock (RBT). ; The verification of the model was performed by comparing the results obtained on site during the passage of ET-22 locomotive and twenty (20) open goods wagons with the results obtained in the program for the identical type of rolling stock used to the simulation Pendolino train. Then, after the verification, the simulation of high-speed train passage was performed. The speed of the train passage varied from 150 [km/h] to the max. possible speed of 250 [km/h] which PENDOLINO train, approved for the simulation, may reach. Under the analysis of obtained results it was possible to define the conditions for adjusting the historic bridge to high-speed train passage.
Publisher:
Zielona Góra: Uniwersytet Zielonogórski
Date:
Resource Type:
Format:
DOI:
Pages:
Source:
IJAME, volume 20, number 2 (2015)