Szukana fraza: [Abstract = "The results show that ten main effects of delays in the construction sector are at the origin of many constraints that have a negative impact on the economy of the country. Further, the factor analysis technique was performed to categorize the identified effects into main groups, and it yielded 5 groups \(factors\). As an important contribution, the relationship between these groups was tested using the SMART\-PLS, and a structural model has been developed."]